Four Seasons Luxor - TMG & Atrium
We have made a calculations for all the following :-
1. External Static Pressure for the following :-
a. Air handling units.
b. Energy recovery units.
c. Fan coil units.
d. Fans
2. Pump flow rate & head for the following :-
a. Firefighting Pump.
b. Chilled water primary pump.
c. Chilled water secondary pump.
d. Boiler system primary pump.
e. Boiler system secondary pump.
3. Expansion tank capacity for the following :-
a. Chilled water network.
b. Heating water network.
